Scheduling is part of the decision. An urgent fault and a planned upgrade should not be written as if they take the same slot.
A useful page about Jimsexcelauto names the job, the constraint, and what a reader should https://autorepairforsmallbusine006377.blogcheer.com/875164/how-to-read-a-quote-for-mechanic