Penmann recently finalised a complex HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production requirements. The contract covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://bookmarkleader.com/story20682247/penmann-ltd-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2